How to Install a Garden Edge with Bricks
A brick garden edge is a practical way to define garden beds, keep mulch and soil contained, and give your yard a clean, finished look. For Australian homeowners, this is a straightforward DIY bricklaying job that can usually be completed over a weekend with basic tools and careful set-out. This gu
- Skill level
- Beginner to Intermediate
- Time
- 4–8 hours for 5–10 m of garden edging
- Trade
- Building & Construction
- Updated
- 4 November 2026
Tools you will need
- Brick bolster and club hammer for cutting bricks
- Brick trowel, approximately 250 mm
- Spirit level, minimum 600 mm
- String line and line pins
- Tape measure, minimum 5 m
- Shovel and garden spade
- Hand tamper or plate compactor for longer runs
- Rubber mallet
- Wheelbarrow
- Bucket for water and mortar mixing
🧱 Installing a Brick Garden Edge: A Simple DIY Weekend Project
What is a brick garden edge and why install one?
A brick garden edge is a practical way to define garden beds, keep mulch and soil contained, and give your yard a clean, finished look. For Australian homeowners, this is a straightforward DIY bricklaying job that can usually be completed over a weekend with basic tools and careful set-out.
This guide covers a simple brick garden edging installation using a compacted base and mortar or dry-laid method, suitable for most flat or gently sloping residential gardens. If the edging is retaining soil at height or supporting loads, seek engineering advice and check local council requirements.
What skill level is required to install a brick garden edge?
Beginner to Intermediate — Estimated time: 4–8 hours for 5–10 m of garden edging
What tools are required for installing a brick garden edge?
What materials are needed for a brick garden edge installation?
What safety requirements apply to brick garden edge installation?
Step-by-Step Guide
Step 1: Plan the Layout
Mark out the proposed garden edge using a hose, string line, or marking paint. For straight runs, use a string line pulled tight between stakes. For curves, a hose or flexible strip works well to visualise the shape before digging.
Measure the full length and calculate how many bricks you need. Standard bricks vary, but many common Australian bricks are around 230 mm x 110 mm x 76 mm. Decide whether the bricks will be laid flat, on edge, or at an angle in a soldier-style finish, as this affects both quantity and excavation depth.
Check that the edging will not trap water against buildings or direct runoff where it is not wanted. Maintain a neat alignment and ensure the edge sits comfortably with surrounding lawn, paths, and garden levels.
Step 2: Excavate the Trench
Dig a trench along the marked line wide enough for the brick plus working room, generally 150–250 mm wide depending on the brick orientation. Depth will depend on your base and the amount of brick you want exposed above ground.
For a typical flat-laid brick edge, excavate to allow:
Remove soft spots, roots, and loose organic material from the trench. The base should be firm and reasonably even before adding sub-base.
Step 3: Prepare and Compact the Base
Add road base or crusher dust in layers and compact it well to a finished depth of 50–75 mm. For short runs, a hand tamper is usually enough. For larger areas or tougher ground, hiring a plate compactor is often more economical than buying one for a one-off job.
Check the base with a spirit level and string line. A garden edge does not need to be perfectly level if following natural ground, but it should be smooth, consistent, and free from sudden dips or rises.
If you are dry laying, spread a bedding layer of washed sand to 20–30 mm and screed it level. If using mortar, prepare for the mortar bed in the next step.
Step 4: Mix Mortar if Using a Mortared Edge
For a more permanent garden edge, lay the bricks on a mortar bed. A common general-purpose mortar mix is 1:2:3, adjusted to suit the sand and workability needed. Mix only enough that you can use comfortably before it starts to stiffen.
The mortar should be workable but not too wet. If it is overly wet, bricks can sink and alignment becomes difficult. Keep your mix consistent from batch to batch for uniform strength and finish.
For simple decorative edging with no traffic loads, some DIYers choose a dry-laid method on compacted base and sand. This is easier to adjust later, but it is less resistant to movement over time.
Step 5: Set the String Line and Lay the First Bricks
Run a string line to the finished face and height of the edging. Start at the most visible point, a corner, or a straight section near a path. Place the first brick carefully and tap it into position with a rubber mallet.
Check each brick for level, alignment, and consistent spacing. If mortaring, butter the ends where needed and bed the brick firmly into the mortar. Keep joints neat and generally around 10 mm for a clean, traditional appearance.
For curved edges, slightly fan the joints to follow the curve smoothly. Avoid forcing tight curves with full bricks if it creates awkward gaps; cut bricks neatly where needed.
Step 6: Continue Laying and Cut Bricks to Fit
Lay the remaining bricks along the string line, checking every few bricks with the level and by sighting along the edge. Small errors add up quickly, so correct them as you go.
Where cuts are needed, mark the brick clearly and cut it using a brick bolster and club hammer, or a suitable masonry saw if available. For beginners, take your time and make cuts on stable ground away from the laid work.
If you are creating a decorative pattern such as soldier course or angled edging, keep the angle and visible height consistent. A simple flat or upright edge is usually the easiest and cleanest option for DIY installation.
Step 7: Finish the Joints and Backfill
If using mortar, tool the joints once the mortar has started to firm up but is not fully hardened. A jointing tool or a short piece of hose can be used to create a neat, slightly compressed finish.
Brush excess mortar from the brick faces before it sets. Do not smear wet mortar across the face of clay bricks, especially lighter-coloured ones, as staining can be difficult to remove.
Backfill both sides of the edging with soil, mulch, or gravel and compact lightly by hand. This helps support the bricks and locks the edge in place.
Step 8: Final Checks and Clean-Up
Walk the length of the edge and inspect for straightness, smooth curves, even height, and secure bedding. Make any small adjustments immediately if dry laid, or before the mortar hardens if mortared.
Lightly clean the finished edge with a soft broom and minimal water. Avoid flooding fresh mortar. Keep foot traffic off the edging until the mortar has cured adequately, typically at least 24–48 hours depending on weather.
Dispose of leftover materials responsibly and store spare bricks for future repairs or extensions.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
Frequently asked questions
- What is involved in install a garden edge with bricks?
- A brick garden edge is a practical way to define garden beds, keep mulch and soil contained, and give your yard a clean, finished look. For Australian homeowners, this is a straightforward DIY bricklaying job that can usually be completed over a weekend with basic tools and careful set-out. This gu
- What skill level do I need for install a garden edge with bricks?
- Beginner to Intermediate — Estimated time: 4–8 hours for 5–10 m of garden edging
- What are common mistakes when install a garden edge with bricks?
- 1. Skipping base preparation and laying bricks directly onto loose soil, which leads to sinking and movement. 2. Using an uneven trench depth, causing inconsistent brick height and a wavy finished edge. 3. Making mortar too wet, which weakens the bed and makes the bricks harder to keep aligned. 4. Failing to use a string line, resulting in crooked runs and poor visual finish. 5. Not allowing for d
- What tools do I need for install a garden edge with bricks?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What is involved in installing a garden edge with bricks?
- Installing a brick garden edge involves defining garden beds, containing mulch and soil, and enhancing yard aesthetics. For Australian homeowners, this is a straightforward DIY bricklaying job, typically completed over a weekend with basic tools. The process includes site preparation, trenching, base compaction, brick laying with mortar or dry, and finishing.
- What skill level do I need for installing a garden edge with bricks?
- A beginner to intermediate skill level is suitable for installing a brick garden edge. The estimated time for completion is 4–8 hours for 5–10 metres of garden edging. Basic bricklaying knowledge, careful set-out, and adherence to safety guidelines are key for a successful outcome.
- What are common mistakes when installing a garden edge with bricks?
- Common mistakes include skipping base preparation, leading to sinking; using an uneven trench depth, causing inconsistent brick height; making mortar too wet, weakening the bed; and failing to use a string line, resulting in crooked runs. Proper compaction and consistent mortar mix are crucial for durability.
- What Australian Standards apply to bricklaying for garden edging?
- While no specific Australian Standard directly governs garden edging, AS/NZS 3725:2007 'Design of residential slabs and footings' offers relevant guidance on soil preparation and compaction for stability. Additionally, SafeWork Australia guidelines on manual tasks and PPE are essential for safety during the installation process.
Written by Bricko, the Building & Construction specialist at Aus.Tools.