How to install a new hot water system (electric or gas)

Installing a new hot water system involves safe isolation, removal of the existing unit, correct selection and positioning of the replacement system, compliant connection of water, drainage, electrical or gas services, and full commissioning. Plumbing work in Australia must be performed by a license

Skill level
Advanced
Time
4–8 hours for like-for-like changeover, 1–2 days where upgrades, relocations, electrical works, flueing, or gas line alterations are required
Trade
Plumbing
Updated
4 November 2026

Tools you will need

  • Multigrips and Stillson/pipe wrenches
  • Press tool with jaws for copper or stainless press
  • Tube bender for copper pipework
  • Propane/MAP torch kit if silver solder/brazing is required
  • Adjustable spanners and ring/open
  • Manometer for gas pressure testing
  • Digital thermometer for outlet temperature verification
  • Pressure gauge for water pressure checks
  • Cordless drill/driver with masonry bits and anchors
  • Level and tape measure

🔧 Installing a New Hot Water System (Electric or Gas) in Australia

What is involved in installing a new hot water system in Australia?

Installing a new hot water system involves safe isolation, removal of the existing unit, correct selection and positioning of the replacement system, compliant connection of water, drainage, electrical or gas services, and full commissioning. Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.

For Australian installations, work must comply with the PCA, AS/NZS 3500, relevant manufacturer instructions, and state-based licensing requirements such as NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Gas work requires a separate gas fitter licence.

What skill level is required to install a hot water system?

Advanced — Estimated time: 4–8 hours for like-for-like changeover, 1–2 days where upgrades, relocations, electrical works, flueing, or gas line alterations are required

What tools are essential for hot water system installation?

Pipe cutters suitable for 15 mm, 20 mm, and 25 mm copper
Multigrips and Stillson/pipe wrenches
Press tool with jaws for copper or stainless press-fit systems
Tube bender for copper pipework
Propane/MAP torch kit if silver solder/brazing is required
Adjustable spanners and ring/open-end spanner set
Torque wrench for gas unions and specified fittings where required
Manometer for gas pressure testing
Digital thermometer for outlet temperature verification
Pressure gauge for water pressure checks
Cordless drill/driver with masonry bits and anchors
Level and tape measure
PVC cutter and solvent cement applicators for drain lines
Bucket, hose, and drain-down pump if needed
Leak detection spray for gas joints
Electrical lockout/tagout kit
Combustion analyser where required for gas appliance commissioning
Personal protective equipment: gloves, eye protection, hearing protection, long sleeves, safety boots

What materials are needed for a hot water system installation?

New hot water system: electric storage, gas storage, or gas continuous flow unit sized to load requirements
Copper tube to AS 1432 in 15 mm, 20 mm, or 25 mm as required
PEX or multilayer pipe/fittings to relevant Australian certification where permitted by design and manufacturer
Valves and fittings to AS/NZS 3500 requirements:
Isolation valve
Non-return valve where required
Pressure limiting valve where required
Expansion control valve where required
Tempering valve for sanitary hot water delivery
Duo valve/combination inlet control assembly where specified
Temperature pressure relief valve supplied or specified for the unit
Safe tray and drain line where required
Copper or polymer discharge pipework sized to manufacturer and code requirements
Gas piping and fittings to AS/NZS 5601 where applicable
Approved gas cock, regulator components, and test point where required
Flue components approved by manufacturer for gas storage systems
Electrical isolator, circuit protection, and cabling by licensed electrician for electric units
Lagging/insulation for external pipework
Wall brackets, plinth, slab, or mounting frame as required
Thread sealant/hemp and approved gas-rated thread tape where appropriate
Condensate drain materials for high-efficiency gas units if required
WELS-compliant fixtures downstream where part of system upgrade, typically 4-star or better where practical

Safety Requirements

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Isolate water, electrical, and gas services before commencing removal or installation.
Gas work requires a separate gas fitter licence.
Confirm compliance with the PCA, AS/NZS 3500, and for gas installations AS/NZS 5601.
Electrical connection and final energisation of electric storage systems must be completed by a licensed electrician where required by state legislation.
Verify the structural adequacy of wall mounts, slabs, and supporting surfaces.
Use correct flue clearances and ventilation provisions on gas appliances as per manufacturer instructions and code.
Discharge from relief valves must terminate compliantly and not create a scalding hazard.
Set and verify delivery temperature at sanitary fixtures via tempering valve in accordance with applicable requirements, typically max 50°C to bathrooms.
Check water pressure before installation; excessive pressure may require a pressure limiting valve.
Do not commission a storage tank dry.
Use safe manual handling techniques; tanks are bulky and heavy.
Test all gas joints with a manometer and leak detection fluid before commissioning.

Step-by-Step Guide

Step 1: Assess the Existing Installation and Select the Replacement Unit

Inspect the failed or outdated system and confirm the reason for replacement: tank rupture, thermostat failure, burner fault, insufficient capacity, energy upgrade, or compliance issue. Record fuel type, storage volume or flow rate, location, available clearances, pipe sizes, electrical supply, gas meter capacity, flue arrangement, and relief drain discharge path.

Size the new unit to the dwelling or commercial demand profile. For storage systems, review occupancy, peak draw-off, recovery rate, and tariff suitability. For continuous flow gas systems, calculate peak simultaneous demand and fixture flow rates. Where replacing an old electric storage unit with gas or heat-source alternatives, confirm service upgrades and authority requirements.

💡 Match the replacement with the site conditions first, not just the nominal litre rating. A poorly sized unit is one of the most common causes of callbacks.

Step 2: Confirm Compliance Requirements and Site Conditions

Review manufacturer instructions in conjunction with the PCA and AS/NZS 3500. Check whether a safe tray is required, whether seismic or cyclonic restraints apply locally, and whether drainage, access, ventilation, and clearances meet current requirements.

For gas appliances, confirm flueing method, terminal clearances, room ventilation, and gas pipe sizing in accordance with AS/NZS 5601. Check whether tempering is required to sanitary outlets and whether existing valves must be replaced to bring the installation up to standard.

🔒 Licensing

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. State licensing applies through NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Gas work requires a licensed gas fitter.

Step 3: Isolate Services and Drain Down the Existing System

Shut off the cold water inlet to the heater and isolate power or gas. Lock out electrical supply and verify dead before touching any electric unit. For gas, close the appliance gas cock and confirm isolation.

Connect a hose to the drain point if fitted, open a nearby hot tap, and drain the tank. Where no adequate drain point exists, disconnect carefully once pressure is relieved. Be prepared for sediment-heavy discharge on older systems.

⚠️ Safety

Never disconnect an electric storage unit until electrical isolation has been confirmed.
Never loosen gas fittings until the gas supply is shut off and tested safe.
Water in failed systems may still be near scalding temperature.

Step 4: Disconnect and Remove the Existing Unit

Disconnect hot, cold, relief drain, safe tray drain, electrical conduit, and gas connection as applicable. Remove flue sections from gas storage systems in accordance with safe handling procedures. Cap or seal open services temporarily to prevent contamination or accidental release.

Remove the old unit from the site using appropriate lifting methods. Inspect the base, wall, or platform for corrosion, movement, non-compliant supports, or signs of chronic leakage.

💡 If the previous unit failed due to corrosion, inspect the relief drain termination and inlet control components closely. Chronic overpressure and poor drainage often contribute to premature failure.

Step 5: Prepare the Base, Mounting Area, and Service Connections

Set the new system on a stable, level, compliant base. External units may require a concrete slab or proprietary plinth; wall-hung continuous flow systems require suitable structural fixing. Maintain required service clearances for access, relief valve replacement, burner servicing, and element replacement.

Rough in or alter pipework as needed. Confirm that cold inlet, hot outlet, relief drain, gas line, electrical conduit, and condensate drain locations line up without inducing stress into the appliance connections.

Step 6: Install the Water Services and Control Valves

Connect the cold water inlet with the required inlet control arrangement. Depending on pressure conditions and appliance type, this may include an isolation valve, non-return valve, pressure limiting valve, and expansion control valve. Fit the hot outlet connection and support pipework properly.

Install a tempering valve where required for sanitary fixtures. Run tempered lines to bathrooms and similar outlets as required by code, while kitchen and laundry arrangements should follow local interpretation and design requirements. Insulate external hot pipework and any exposed pipework likely to lose heat.

Typical domestic water connections are commonly in 15 mm or 20 mm copper, but always size to appliance requirements and calculated demand.

Step 7: Install Relief Valve Drain, Safe Tray Drain, and Discharge Pipework

Fit the temperature pressure relief valve supplied or specified for the unit. Run discharge pipework in approved material, continuously graded to drain, terminating in a visible and compliant location. Avoid restrictions, kinks, or undrained low points.

Where a safe tray is required, install it beneath the unit with an independent drain line to an approved discharge point. Ensure the tray drain does not rely on the relief drain and that both remain serviceable and visible where required.

💡 Relief drain workmanship matters. Poorly graded discharge lines are a frequent defect and can create nuisance dripping, corrosion, or concealed water damage.

Step 8: Connect Electrical or Gas Services

For electric storage units, arrange licensed electrical connection to the correct circuit, tariff, isolator, and protection device. Confirm element rating, supply voltage, earthing, and that the tank is filled before energisation.

For gas systems, connect the gas line using approved fittings and isolation. Purge in accordance with safe procedures, pressure-test the line, and verify inlet pressure under operating conditions. Install flue components exactly to manufacturer specification for storage gas units, or terminal components for continuous flow systems. Install condensate drainage where required on high-efficiency models.

Gas pipe sizing must suit the appliance load and installation length. Common branch sizing may start at 20 mm or larger depending on total MJ demand and run length; calculate rather than assume.

⚠️ Safety

Gas work requires a separate gas fitter licence.
Do not reuse damaged or non-compliant flue components.
Never energise an electric tank before it is fully filled and purged of air.

Step 9: Fill, Purge, Pressure Test, and Commission the System

Open the cold water inlet and fill the system slowly. Open downstream hot taps to purge air until a steady flow is established. Inspect all water joints under pressure. Test operation of the relief valve and verify there are no leaks from inlet control components, unions, or appliance connections.

For electric systems, once full, energise and verify element and thermostat operation. For gas systems, light and commission in accordance with manufacturer procedure, confirm burner ignition, flame stability, combustion performance where applicable, and outlet temperature.

Check tempered water delivery temperature at the relevant fixtures and adjust the tempering valve accordingly. Verify water pressure, recovery, and discharge function. Record test results as required.

Step 10: Final Compliance Checks, Handover, and Documentation

Complete final checks for access, clearances, support, insulation, valve orientation, drain termination, labeling, and general workmanship. Remove debris and dispose of the old unit in accordance with site and recycling requirements.

Provide the owner or site representative with operating instructions, warranty information, maintenance requirements, and any compliance documentation required in the jurisdiction. Note service intervals, anode inspection intervals for storage tanks where applicable, and expected relief valve testing requirements.

💡 Recommend fixtures with strong water efficiency performance where upgrading the full system. WELS 4-star to 6-star showers and taps can reduce hot water load substantially without compromising performance when pressure is adequate.

Common Mistakes to Avoid

1.Installing a replacement unit based only on tank litres without checking recovery rate, tariff, or simultaneous demand.
2.Reusing old or incorrect inlet control valves, tempering valves, or relief components that no longer comply.
3.Undersizing the gas line or ignoring available meter capacity, leading to poor burner performance and lockouts.
4.Failing to grade relief and tray drain lines correctly, causing standing water, corrosion, or concealed leakage.
5.Energising an electric storage system before the tank is fully filled, which can instantly damage the element.

Pro Tips

Use a full like-for-like replacement checklist covering pressure, tempering, drainage, electrical, gas, flue, and access so nothing is missed on fast changeovers.
Where static pressure is high, replace or add the pressure limiting valve and review expansion control at the same time to protect the new cylinder.
On coastal sites, consider system durability carefully and protect exposed connections with appropriate materials and installation methods.
For continuous flow gas units, confirm peak simultaneous demand against realistic fixture flow rates, not brochure assumptions.
Photograph valve arrangements, model numbers, and compliance details at completion for service records and future warranty support.

Recommended Tools

RIDGID 35S/42A tube cutter — clean, accurate cuts on copper in common domestic sizes
Milwaukee or Rothenberger press tool kit — fast, repeatable compliant jointing for changeovers
Testo digital manometer — accurate gas pressure testing and commissioning
Knipex Cobra multigrips — reliable grip on valves, unions, and mixed fittings
Fluke digital thermometer — quick tempering valve outlet verification and commissioning checks

Frequently asked questions

What is involved in install a new hot water system (electric or gas)?
Installing a new hot water system involves safe isolation, removal of the existing unit, correct selection and positioning of the replacement system, compliant connection of water, drainage, electrical or gas services, and full commissioning. Plumbing work in Australia must be performed by a license
What skill level do I need for install a new hot water system (electric or gas)?
Advanced — Estimated time: 4–8 hours for like-for-like changeover, 1–2 days where upgrades, relocations, electrical works, flueing, or gas line alterations are required
What are common mistakes when install a new hot water system (electric or gas)?
1. Installing a replacement unit based only on tank litres without checking recovery rate, tariff, or simultaneous demand. 2. Reusing old or incorrect inlet control valves, tempering valves, or relief components that no longer comply. 3. Undersizing the gas line or ignoring available meter capacity, leading to poor burner performance and lockouts. 4. Failing to grade relief and tray drain lines co
What tools do I need for install a new hot water system (electric or gas)?
This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
What Australian standards apply to hot water system installations?
The primary Australian standard for hot water system installations is AS/NZS 3500.4:2021 Plumbing and drainage - Hot water supply systems. Additionally, AS/NZS 5601.1 applies to gas installations, and AS/NZS 3000 Wiring Rules for electrical connections. All installations must also comply with the Plumbing Code of Australia (PCA) and relevant state-based regulations.

Written by Pipey, the Plumbing specialist at Aus.Tools.