How to install a new tap

Learn how to install a new tap in Australia. Step-by-step trade guide covers PCA compliance, AS/NZS 3500 standards, tool selection, isolation, and testing.

Quick answer

To install a new tap in Australia, isolate the water supply, disconnect flexible hoses, unbolt the under-sink retaining nut, and lift out the old fixture. Fit the new WaterMark-certified mixer using fresh rubber seals, secure the mounting plate, and hand-tighten braided lines before torquing one-quarter turn under AS/NZS 3500.

Skill level
Beginner / Intermediate
Time
1 to 3 hours
Trade
Plumbing
Updated
4 November 2026

Tools you will need

  • Rothenberger Telescopic Basin Wrench (32-50mm)
  • Knipex 250mm Cobra Water Pump Pliers
  • Bahco 200mm Wide-Jaw Adjustable Wrench
  • Monument 324C Tube Box Spanner Set
  • Ledlenser H7R Core Rechargeable Headlamp
  • Milwaukee 5m Magnetic Tape Measure

🔧 How to install a new tap in Australia — trade guide for a straightforward replacement

What is involved in installing a new tap in Australia?

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Installing a new tap is a common upgrade in kitchens, bathrooms and laundries, but the method varies depending on whether you are replacing a mixer tap or separate pillar taps, and whether the tap is mounted to a basin, sink or benchtop.

This guide covers a typical tap replacement process for Australian homes, including isolation, removal, fit-off, reconnection and leak testing. For compliance, plumbing work should align with the Plumbing Code of Australia (PCA) and AS/NZS 3500, and any regulated plumbing work must be carried out by a licensed plumber in your state or territory.

What skill level is required for tap installation?

Beginner / Intermediate — Estimated time: 1 to 3 hours

What tools are essential for Australian tap installation?

🔧 Tools Required

Adjustable spanner, 200 mm to 250 mm
Basin spanner / tap backnut spanner for hard-to-reach retaining nuts
Multigrips / groove joint pliers
Tube spanner set for older tap assemblies
Flathead and Phillips screwdrivers
Allen key set for mixer handle grub screws
Bucket or shallow tray for residual water
Towels or rags
Torch or headlamp for under-sink visibility
Tape measure
Utility knife
Non-marring scraper or plastic spatula for removing old sealant
PTFE thread seal tape for threaded accessory connections where approved by manufacturer
Silicone gun if sanitary sealant is required around the base
Optional: mini hacksaw or oscillating multi-tool for seized old mounting hardware
Optional: water pressure gauge if checking excessive pressure before installation

What materials are needed for a new tap installation?

🪵 Materials

New tap assembly:
Mixer tap, or
Basin/sink set with hot and cold taps
Flexible tap connectors approved for Australian use, typically DN15 (15 mm) / 1/2 inch BSP
Mini stop taps / isolation valves if existing valves are faulty or absent, typically DN15 (15 mm)
New rubber seals, fibre washers or sealing gaskets supplied by the tap manufacturer
Backnut, horseshoe plate or fixing kit supplied with the tap
Sanitary-grade neutral cure silicone if specified by manufacturer
Threaded adaptors if required to suit existing connections
WELS-rated tapware:
Bathroom taps commonly 4 Star to 6 Star WELS
Kitchen mixers commonly 4 Star to 6 Star WELS
Optional water hammer arrestor if pipe noise is present
Optional tempering valve considerations where connected to sanitary fixtures requiring delivery temperature control under Australian requirements

Safety Requirements

⚠️ Safety

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Check local licensing requirements:
NSW Fair Trading
VIC VBA
QLD QBCC
WA Building Commission
Isolate water supply before starting. Open the tap after shut-off to confirm pressure is off.
Use caution in cupboards with nearby power points, dishwashers, insinkerators or lighting transformers.
Hot water may be stored at high temperature. Avoid contact when disconnecting hot services.
Do not overtighten ceramic cartridge tapware, braided connectors or retaining hardware.
Only use tapware and connectors that are WaterMark certified for Australian installation.
Gas work requires separate gas fitter licence and is not part of this task.
If the tap connects to tempered water, thermostatic mixing arrangements, or commercial sanitary systems, compliance with PCA and AS/NZS 3500 is especially important.
If pipework, isolation valves or threads are corroded, damaged or leaking inside the wall/cabinet, stop and call a licensed plumber.

Step-by-Step Guide

Step 1: Identify the tap type and mounting arrangement

1️⃣ Confirm the tap style

Work out whether you are installing:

A single-hole mixer tap
A three-piece set with separate hot and cold handles plus spout
Wall-mounted tapware
A basin-mounted, sink-mounted or benchtop-mounted tap

Check the number of holes in the sink or basin and compare them to the new tap. A single-hole mixer usually suits one mounting hole, while a three-piece set needs separate penetrations.

Also confirm the connection type underneath. Most Australian domestic tap connections are DN15 (15 mm) with 1/2 inch BSP threads, but older homes may have non-standard arrangements.

💡 Choose a tap with a suitable WELS star rating to reduce water use without sacrificing performance.

Step 2: Isolate the water supply

2️⃣ Turn off water safely

Locate the isolation valves under the sink or basin. Turn off both hot and cold mini stops by rotating them clockwise.

If there are no local isolation valves, shut off the water at the property main. Then open the existing tap to drain pressure and residual water. Keep a bucket and towels under the work area.

If replacing a kitchen mixer, also check whether nearby appliances share the same cabinet space and need protection from spills.

Step 3: Inspect the existing pipework and valves

3️⃣ Check condition before removal

Before undoing anything, inspect:

Isolation valves
Braided flexible connectors
Copper tails
Threaded outlets
Cabinet base for water damage

If you see green corrosion on copper, rusted threads, swollen cabinetry or valves that do not fully isolate, the job may expand beyond a simple tap swap.

💡 If the mini stop valves are old, stiff or dripping from the spindle, replacing them at the same time is often worthwhile — but that work should be done by a licensed plumber.

Step 4: Disconnect the old tap

4️⃣ Undo the water connections

Place a bucket underneath. Using an adjustable spanner or multigrips, disconnect the hot and cold flexible connectors from the isolation valves.

For older taps with rigid copper tails, use care not to twist or kink pipework. Some installations use threaded tails with tube nuts; others use flexible braided hoses.

Allow remaining water to drain into the bucket.

Step 5: Remove the old mounting hardware

5️⃣ Release the tap from the sink or basin

From underneath the sink or vanity top, locate the retaining nut, horseshoe clamp, threaded shank or backnut holding the tap in place.

Use a basin spanner or tube spanner to loosen it. In tight spaces, this is usually the slowest part of the job. Once the retaining hardware is off, lift the old tap out from above.

If the base is stuck due to old silicone or grime, gently cut around it with a utility knife and lift carefully to avoid damaging ceramic or stainless steel surfaces.

Step 6: Clean and prepare the mounting surface

6️⃣ Create a clean sealing surface

Remove old silicone, putty, scale and debris from around the tap hole. Wipe the area clean and dry.

Check the mounting hole size against the new tap manufacturer’s requirements. Most mixer taps suit a standard basin or sink hole, but always verify the minimum and maximum hole diameter.

A clean, flat surface helps the rubber gasket seal properly and prevents the tap from rocking after installation.

Step 7: Assemble the new tap as per manufacturer instructions

7️⃣ Pre-fit components

Unpack the new tap and identify:

Rubber or foam base gasket
Threaded shank
Flexible hoses
Retaining plate
Backnut
Dress ring or base plate

Many mixer taps require the flexible hoses to be threaded into the tap body before the tap is mounted. Tighten to the manufacturer’s instructions only — do not overtighten.

Check which hose is hot and which is cold. In Australia, hot is typically on the left and cold on the right when facing the tap.

Step 8: Install the new tap into position

8️⃣ Fit the tap to the basin, sink or bench

Feed the tap tails or braided hoses through the mounting hole from above. Make sure the base gasket is correctly seated.

From underneath, fit the retaining plate and backnut. Align the tap so the spout is centred and straight, then tighten the mounting hardware evenly.

Do not overtighten. The tap should be firm with no movement, but excessive force can crack basins, distort stainless sinks or damage the fixing kit.

For some sink installations, a stabilising plate may be supplied for thin stainless steel bowls. Use it if recommended.

Step 9: Connect the water supply lines

9️⃣ Reconnect hot and cold services

Attach the flexible connectors to the isolation valves. Usually these are DN15 (15 mm) / 1/2 inch BSP connections.

Start threads by hand to avoid cross-threading, then tighten with a spanner to the tap manufacturer’s guidance. Do not use thread tape on braided hose cone seals unless specifically directed by the manufacturer, because many flexi hoses seal on a washer or cone, not the thread.

Ensure:

Hot connects to hot
Cold connects to cold
Hoses are not kinked, twisted or sharply bent
Hoses do not rub on sharp cabinet edges

Step 10: Turn the water back on gradually

🔟 Re-pressurise the system carefully

Leave the tap in the open position, preferably in the middle for a mixer. Slowly open the cold isolation valve, then the hot isolation valve.

This helps purge air and reduces sudden pressure shock. Water may sputter briefly as air leaves the lines.

Once water flows smoothly, close the tap and inspect all joints underneath with a torch and dry tissue or paper towel.

Step 11: Test for leaks, operation and temperature

1️⃣1️⃣ Check performance thoroughly

Run both hot and cold water and inspect:

Under-sink connections
The tap base
Around the mounting hole
The spout and aerator
Handle operation and cartridge movement

If it is a mixer, confirm temperature blends correctly and that hot is on the left side. If fitted to a bathroom basin, confirm delivery temperature is safe and consistent where tempering is required in the broader plumbing system.

Let the tap run for 1 to 2 minutes to flush debris from new hoses and the aerator.

Step 12: Final fit-off and clean-up

1️⃣2️⃣ Finish the installation neatly

If the manufacturer calls for silicone around the base, apply a small neat bead of neutral cure sanitary silicone. Many modern taps rely on a gasket and do not require extra sealant, so follow product instructions.

Wipe down all surfaces, remove packaging and store the installation booklet and warranty details. Recheck for leaks after 15 to 30 minutes, and again after the first day of use.

Common Mistakes to Avoid

1.Not confirming the new tap matches the existing hole configuration and mounting hole size.
2.Forgetting to isolate both hot and cold water supplies before disconnecting the old tap.
3.Overtightening braided hose connections, retaining nuts or ceramic basin fixings.
4.Using PTFE tape on fittings that seal with a rubber washer or cone seal, which can cause leaks or cracked fittings.
5.Crossing hot and cold connections, resulting in reversed operation.
6.Leaving flexible hoses twisted, kinked or under tension.
7.Failing to check for small slow leaks after repressurising.

Pro Tips

💡 Choose WaterMark-certified tapware from reputable brands commonly supported in Australia, such as Caroma, Methven, Dorf, Phoenix, Oliveri or Clark.

💡 For kitchen sinks with thin stainless steel, use the supplied stabilising plate or spacer to reduce movement and improve long-term rigidity.

💡 If water pressure is very high, a new tap may become noisy or wear faster. A licensed plumber can check compliance with AS/NZS 3500 and whether pressure limiting is needed.

💡 Compare WELS star ratings before buying. A higher star rating can reduce water consumption, especially in bathrooms and ensuites used daily.

💡 Keep the aerator clean. After installation, debris from older pipework can lodge in the aerator and make a new tap seem faulty when it only needs flushing.

Recommended Tools

🔧 Recommended Tools

Basin Spanner — essential for loosening and tightening hard-to-reach tap backnuts
Shifter 250 mm — useful all-round adjustable spanner for tap connectors and valves
Multigrip Pliers — handy for holding fittings and dealing with older pipe connections
Allen Key Set — needed for many mixer tap handles with hidden grub screws
Headlamp or LED Work Light — makes under-sink work much easier in tight cabinets

🔒 Licensing

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. Licensing requirements vary by state, including NSW Fair Trading, VIC VBA, QLD QBCC and WA Building Commission. If the job involves altering pipework, replacing isolation valves, wall-mounted tapware, concealed plumbing, waterproofing interfaces, or any rectification of leaks inside walls or cabinets, engage a licensed plumber.

Frequently asked questions

Can I legally install a tap myself in Australia?
No, in Australia, tap replacement connected to mains water must legally be completed by a licensed plumber under the Plumbing Code of Australia. Unlicensed work voids home insurance policies, risks fines up to $40,000 depending on the state, and can cause significant structural water damage if connections fail.
What tools are needed to install a basin mixer tap?
Installing a basin mixer tap requires a dedicated basin wrench, adjustable spanners, tube spanners, and multigrips for securing fittings in tight cavities. You will also need a bucket, microfibre towels, an LED headlamp, thread tape, and replacement braided flexible connectors with rubber cone seals compliant with AS/NZS 3499.
How do you avoid leaking flexible braided tap hoses?
To prevent leaks, avoid over-tightening braided hose nuts and ensure the internal rubber washer seats flat without twisting the stainless steel braid. Do not apply thread seal tape to parallel BSP threads using rubber cone washers, as this prevents proper seating and causes premature washer deformation or failure.
What Australian standards apply to replacement tapware?
Tapware installed in Australia must comply with AS/NZS 3718 and carry a valid WaterMark certification alongside a WELS water efficiency star rating. Supply connections must adhere to AS/NZS 3500.1 for cold water and AS/NZS 3500.4 for heated water systems, ensuring rated working pressures do not exceed 500 kPa.
How do you isolate the water supply before replacing a tap?
Isolate the water supply by turning off the local mini cistern stop cocks under the sink clockwise until firm. If local stops are absent, shut off the property's main water meter valve at the boundary, then open the lowest fixture tap to relieve residual hydrostatic pressure before unbolting fittings.
Why is my new mixer tap loose on the benchtop?
A mixer tap becomes loose when the threaded mounting horseshoe bracket or brass locking nut under the bench is insufficiently torqued or misaligned. Thin stainless steel sinks often require a tap reinforcement bracket or stabiliser plate beneath the sink deck to eliminate flex and maintain a rigid, watertight seal.

Written by Pipey, the Plumbing specialist at Aus.Tools.