How to install a tempering valve on a hot water system

Tempering valves are installed on hot water systems to blend heated water with cold water and deliver safe outlet temperatures to fixtures, typically to sanitary outlets in residential and many commercial applications. In Australia, installation and setting of tempering valves must comply with the

Skill level
Advanced
Time
2–4 hours
Trade
Plumbing
Updated
4 November 2026

Tools you will need

  • Press tool with appropriate jaws for selected press
  • Multigrips and adjustable spanners
  • Pipe deburrer / reamer
  • Measuring tape and marker
  • Spirit level
  • Water pressure gauge
  • Isolation valve key / screwdriver as applicable
  • Bucket, drain hose and cleaning rags

🔧 Installing a Tempering Valve on a Hot Water System — Australian Trade Guide

Why is a tempering valve essential for Australian hot water systems?

Tempering valves are installed on hot water systems to blend heated water with cold water and deliver safe outlet temperatures to fixtures, typically to sanitary outlets in residential and many commercial applications. In Australia, installation and setting of tempering valves must comply with the PCA, AS/NZS 3500, and manufacturer instructions to achieve scald protection, maintain system performance, and satisfy commissioning requirements.

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.

What skill level is required to install a tempering valve in Australia?

Advanced — Estimated time: 2–4 hours

What specific tools are required for tempering valve installation in Australia?

Tube cutters suitable for 15 mm, 20 mm and 25 mm copper
Press tool with appropriate jaws for selected press-fit system, or oxy/LPG soldering kit if using capillary copper
Multigrips and adjustable spanners
Pipe deburrer / reamer
Measuring tape and marker
Spirit level
Water pressure gauge
Thermometer or digital probe thermometer for outlet temperature commissioning
Isolation valve key / screwdriver as applicable
Bucket, drain hose and cleaning rags
PTFE tape or approved thread sealant suitable for potable water
Cordless drill/driver and masonry or timber fixings for valve support brackets

What materials are needed for a compliant tempering valve installation in Australia?

Tempering valve compliant with AS 4032 and suitable for domestic hot water application
Matching union sets / tail kits for valve connection size, commonly 15 mm or 20 mm
Copper tube to AS 1432 in 15 mm, 20 mm or 25 mm as required
Copper fittings to suit installation method, or approved press-fit fittings
Full-flow isolation valves for hot, cold and tempered lines
Line strainers/check valves if required by manufacturer or integrated valve design
Non-return valves where required by system design and manufacturer instructions
Pipe clips, saddles and support bracketry
Approved lagging/insulation for heated pipework where required
Drain cock or commissioning point if not already available
Hot water identification tags / labelling where required
Replacement washers, olives or seals as needed
TMV servicing cap kit / commissioning caps if applicable to valve model

Safety Requirements

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials.
Installation must comply with the Plumbing Code of Australia, AS/NZS 3500.0, AS/NZS 3500.4 and relevant manufacturer instructions.
Confirm local state licensing requirements: NSW Fair Trading, VIC VBA, QLD QBCC, WA Building Commission.
Isolate electrical supply to electric storage units before work begins.
For gas storage or instantaneous systems, gas work requires a separate gas fitter licence.
Allow hot water to cool or drain down safely before cutting into pipework.
Use PPE: gloves, eye protection, long sleeves and hearing protection where needed.
Confirm maximum inlet temperature and pressure are within the tempering valve manufacturer’s limits.
Do not install a tempering valve where a thermostatic mixing valve (TMV) is specifically required by project specification or healthcare/commercial code requirements.
Commission outlet temperature carefully to avoid scalding risk.
Check for cross-connection and backflow risks where secondary supplies or recirculation are present.

Step-by-Step Guide

Step 1: Assess the system and confirm compliance requirements

1️⃣ Identify the application

Confirm whether the valve is being installed on a new hot water service, as part of a replacement, or to rectify non-compliant delivery temperatures. Determine which fixtures are to receive tempered water and whether the kitchen sink is included under the specific project design and local authority interpretation.

Review the required delivery temperature under AS/NZS 3500.4 and applicable state requirements. In most residential applications, heated water delivered to sanitary fixtures used primarily for personal hygiene must be limited to 50°C, and to 45°C in certain aged care, childcare, disability care or healthcare environments where applicable.

💡 Always confirm whether the installation requires a standard tempering valve or a higher-specification TMV with testable performance.

Step 2: Verify hot water unit suitability and valve sizing

2️⃣ Check system operating conditions

Confirm:

Storage temperature setting of the hot water unit
Static and dynamic water pressure
Available flow rate
Pipe sizes on hot, cold and distribution lines
Whether limiting valves, pressure reduction valves, check valves or expansion control devices are already installed

Select a tempering valve with the correct nominal size, usually 15 mm or 20 mm, based on calculated flow demand and fixture load. Check manufacturer data for minimum flow, pressure differential, and maximum inlet temperatures.

Where storage temperature is maintained at 60°C or above for legionella control, ensure downstream tempering arrangement provides compliant delivery temperature without compromising system hygiene strategy.

Step 3: Plan the pipe layout

3️⃣ Set out the installation

Locate the tempering valve as close as practical to the hot water unit outlet while allowing access for adjustment, service, strainers and future replacement. Follow the directional markings for:

Hot inlet
Cold inlet
Mixed/tempered outlet

Plan for:

Isolation valves on hot, cold and tempered lines
Unions for serviceability
Strainers/check valves as required by the valve manufacturer
Adequate support to prevent stress on the valve body
A commissioning point downstream for accurate temperature testing

Maintain a neat, serviceable arrangement with sufficient clearance for removal of caps and servicing components.

Step 4: Isolate, drain and prepare the pipework

4️⃣ Make the system safe to work on

Shut off the cold water supply to the hot water service and isolate any relevant branch lines. Open a downstream hot tap to relieve pressure and drain enough water to work on the selected section of pipe.

If working on an electric storage unit, isolate power at the switchboard. If working near gas appliances, ensure appliance isolation procedures are followed by a licensed gas fitter where required.

Mark cut points carefully and allow for valve body length, unions and any additional isolation valves or fittings.

Step 5: Cut in isolation valves and connection points

5️⃣ Prepare serviceable valve connections

Cut, deburr and clean the pipework. Install full-flow isolation valves on the:

Hot feed to tempering valve
Cold feed to tempering valve
Tempered outlet line

Where the manufacturer requires integral or separate strainers and non-return valves, install them in the correct orientation. Many failures in tempering valve performance are caused by debris or incorrect check valve placement.

Use compatible joining methods:

Press-fit systems to manufacturer specification
Silver solder / capillary where appropriate
Threaded adaptors using approved potable water thread sealant

Support all pipework to prevent loading on the valve body.

Step 6: Install the tempering valve

6️⃣ Fit the valve in the correct orientation

Install the tempering valve observing the embossed flow direction and identified ports. Typical arrangement:

Hot outlet from storage unit into hot inlet of valve
Cold supply branch into cold inlet of valve
Mixed outlet feeding the sanitary hot water distribution line

Ensure unions are aligned and not under tension. Tighten to manufacturer torque guidance where available. Do not overtighten threaded brass bodies or tails.

If the valve is wall-mounted or bracket-supported, secure it so that future servicing does not disturb adjoining pipework.

💡 A well-supported valve and union arrangement significantly reduces call-backs caused by weeping joints and body stress fractures.

Step 7: Refill, purge and pressure check

7️⃣ Restore water carefully

Close open outlets and slowly reopen isolation valves to refill the system. Purge air from hot and tempered lines via downstream taps. Inspect all joints, unions and valves for leaks under static pressure.

Check pressure conditions. Excessive line pressure or imbalance between hot and cold supplies can cause unstable mixed temperatures. If pressure reduction is required, address this before final commissioning.

Where the system includes check valves or backflow devices, confirm the installation does not create unacceptable thermal expansion conditions.

Step 8: Commission the tempering valve

8️⃣ Set outlet temperature accurately

Allow the hot water system to reach stable operating temperature. Run water through the nearest and furthest relevant sanitary fixtures to stabilise flow and temperature.

Using a calibrated thermometer, adjust the tempering valve to achieve the required mixed outlet temperature, commonly:

50°C maximum at personal hygiene fixtures in standard residential applications
45°C maximum where required by building classification or occupancy type

Take temperature readings after steady flow is established. Follow the manufacturer’s adjustment method precisely, then lock or cap the setting.

Record:

Hot inlet temperature
Cold inlet temperature
Mixed outlet set temperature
Pressure readings if relevant
Valve model and installation date

Step 9: Confirm performance across fixtures

9️⃣ Test the distribution system

Check multiple fixtures downstream of the tempering valve to verify that delivered temperature remains compliant after pipe losses and varying flow conditions. Confirm there is no excessive delay, fluctuation, crossover or pressure imbalance.

If there are long branch runs, dead legs or unusual fixture combinations, verify that the selected valve capacity is sufficient. Re-check after several draw-off events.

💡 A tempering valve set correctly at the plant does not guarantee compliant delivery at every outlet unless the downstream system is tested properly.

Step 10: Finalise, label and hand over

🔟 Complete compliance and documentation

Insulate heated pipework where required and secure all pipe supports. Fit access panels or covers without obstructing future servicing. Label the installation if required by site standards or maintenance protocols.

Provide the owner, builder or facility manager with:

Valve make/model details
Commissioned outlet temperature
Service interval recommendations
Manufacturer literature and warranty information

Advise that tempering valves require periodic inspection and may need cleaning, recalibration or replacement depending on water quality and service conditions.

Common Mistakes to Avoid

1.Installing the tempering valve backwards or swapping hot and cold inlets.
2.Omitting isolation valves and unions, making future servicing difficult and non-trade-friendly.
3.Failing to install required strainers or check valves, leading to unstable temperature control and premature valve failure.
4.Setting temperature without allowing the hot water unit to fully recover and stabilise.
5.Assuming one outlet test is enough; downstream fixture temperatures can vary significantly.
6.Using the wrong valve type where a testable TMV is required by specification.
7.Ignoring pressure imbalance between hot and cold supplies, which causes poor mixing performance.

Pro Tips

💡 Install a commissioning tee or accessible test point downstream of the valve to speed up future service checks.
💡 On replacement jobs, flush both hot and cold lines thoroughly before fitting the new valve to prevent debris fouling the cartridge.
💡 Match the valve size to actual demand; oversizing can reduce temperature stability at low flows.
💡 In hard water areas, recommend periodic servicing intervals because scale build-up can affect cartridge response and setpoint accuracy.
💡 Where multiple bathrooms are supplied, verify simultaneous draw-off performance rather than commissioning under single-outlet conditions only.

Recommended Tools

REMS RAS Cu-INOX Tube Cutter — clean cutting on 15 mm and 20 mm copper
Milwaukee M12/M18 Press Tool with copper jaws — fast, consistent press connections
Rothenberger Digital Thermometer — accurate commissioning of outlet temperature
Ridgid 227S Inner-Outer Reamer — proper deburring to protect flow and fitting integrity
Knipex Cobra Multigrips — reliable grip on valves, unions and fittings

🔒 Licensing

Plumbing work in Australia must be performed by a licensed plumber. This guide explains the process and helps you select the right tools and materials. For compliance, refer to the relevant regulator including NSW Fair Trading, VIC VBA, QLD QBCC, and WA Building Commission. Gas-adjacent work on gas hot water systems requires a separate gas fitter licence.

Frequently asked questions

What is involved in install a tempering valve on a hot water system?
Tempering valves are installed on hot water systems to blend heated water with cold water and deliver safe outlet temperatures to fixtures, typically to sanitary outlets in residential and many commercial applications. In Australia, installation and setting of tempering valves must comply with the
What skill level do I need for install a tempering valve on a hot water system?
Advanced — Estimated time: 2–4 hours
What are common mistakes when install a tempering valve on a hot water system?
1. Installing the tempering valve backwards or swapping hot and cold inlets. 2. Omitting isolation valves and unions, making future servicing difficult and non-trade-friendly. 3. Failing to install required strainers or check valves, leading to unstable temperature control and premature valve failure. 4. Setting temperature without allowing the hot water unit to fully recover and stabilise. 5.
What tools do I need for install a tempering valve on a hot water system?
This guide includes a comprehensive tools list. Key plumbing tools are detailed in the Tools Required section.
What is involved in installing a tempering valve on a hot water system?
Tempering valves blend heated water with cold water to deliver safe outlet temperatures, typically 50°C, to fixtures in residential and commercial applications. In Australia, installation and setting must comply with the PCA, AS/NZS 3500, and manufacturer instructions to ensure scald protection and system performance. This process requires a licensed plumber.
What skill level do I need for installing a tempering valve on a hot water system?
Installing a tempering valve is considered an Advanced skill level for a licensed plumber, typically requiring 2–4 hours. This includes selecting the correct valve, precise pipework, ensuring compliant connections, and accurate temperature commissioning according to AS/NZS 3500.4:2021 standards.
What are common mistakes when installing a tempering valve on a hot water system?
Common mistakes include installing the valve backwards, omitting isolation valves for future servicing, and failing to install required strainers or check valves which can lead to unstable temperatures. Crucially, incorrect temperature setting without allowing the hot water unit to fully stabilise is a frequent error that compromises safety and compliance.
What is the Australian standard for tempering valves?
The Australian standard for tempering valves is AS 4032.2:2005, 'Water heaters – Tempering valves'. This standard specifies the requirements for the design, construction, and performance of tempering valves used in domestic hot water systems to ensure safe temperature delivery and prevent scalding. Compliance is mandatory for all new installations.
What is the maximum hot water temperature allowed in Australian homes?
According to AS/NZS 3500.4:2021, the maximum hot water temperature delivered to sanitary fixtures in Australian residential premises must not exceed 50°C. For facilities such as aged care centres and early childhood centres, this maximum temperature is further reduced to 45°C to protect vulnerable occupants from scalding.

Written by Pipey, the Plumbing specialist at Aus.Tools.