Concrete slab / driveway cost in Queensland

A concrete slab / driveway in Queensland typically costs $5,100–$11,920 ex GST for 40 m², most likely about $8,040. Labour is about 39% of the price (37.4 hours). The range uses the award minimum of $29.45/hr from 1 July 2026, regional cost factors and a contingency band. Price data last updated 2 October 2026.

Updated

Cost breakdown: 40 m², Queensland
Cost lineLowLikelyHigh
Materials (40 m² + 8% waste)$1,940$2,590$3,670
Labour (37.4 hrs, crew of 2)$2,380$3,120$3,850
Excavation & base$390$880$1,760
Pump hire$0$590$1,080
Contingency (8–15%)$380$860$1,550
Total (ex GST)$5,100$8,040$11,920

Region: Queensland (regional factor ×0.98 on labour and site costs). About 2.5 working days on site. GST on the likely figure is about $800.

Included

  • 100 mm slab, 25 MPa concrete
  • SL72 mesh and plastic
  • Broom or plain finish
  • Control joints

Not included

  • Exposed aggregate or coloured finishes
  • Rock excavation
  • Stormwater drainage
  • Engineering for heavy vehicles

Common questions

How much does a concrete slab / driveway cost in Queensland?
For 40 m² on a typical site, the Price Card puts it at $5,100–$11,920 ex GST, most likely around $8,040. Change the size, crew, access and condition to see your own range.
What is included in the range?
100 mm slab, 25 MPa concrete; SL72 mesh and plastic; Broom or plain finish; Control joints. Materials include 8% waste, labour is priced by hours for the size and crew, plus site costs and a contingency band.
How much of a concrete slab / driveway price is labour?
Trades are mostly time. On this job labour is about 39% of the likely price (37.4 hours). A charge-out rate is not a wage: the award minimum for a qualified tradesperson is $29.45/hr from 1 July 2026, and super, leave, insurance, vehicle, tools, unbillable time and margin take it to roughly $74–$133/hr (our estimate).
What is not included?
Exposed aggregate or coloured finishes; Rock excavation; Stormwater drainage; Engineering for heavy vehicles. Always confirm with a written quote.
Is this a quote?
No. It is an indicative planning range built from network benchmarks. We show how many real job outcomes have been reported for each job and state. Prices vary by site, supplier and season.