Skip to main content

Timber deck build cost in Northern Territory

A timber deck build in Northern Territory typically costs $8,070–$17,130 ex GST for 20 m², most likely about $11,760. Labour is about 42% of the price (49.9 hours). The range uses the award minimum of $29.45/hr from 1 July 2026, regional cost factors and a contingency band. Price data last updated 2 October 2026.

Updated

Cost breakdown: 20 m², Northern Territory
Cost lineLowLikelyHigh
Materials (20 m² + 10% waste)$3,080$4,620$7,040
Labour (49.9 hrs, crew of 2)$3,840$4,940$6,310
Footings & concrete$390$660$1,100
Waste removal$170$280$440
Contingency (8–15%)$600$1,260$2,230
Total (ex GST)$8,070$11,760$17,130

Region: Northern Territory (regional factor ×1.10 on labour and site costs). About 3.5 working days on site. GST on the likely figure is about $1,180.

Included

  • Treated pine sub-frame on concrete footings
  • Hardwood or merbau decking boards
  • Stainless or galvanised fixings
  • One coat of decking oil

Not included

  • Council / certifier fees
  • Balustrades and stairs over 1 m
  • Roofing or pergola
  • Engineering for elevated decks

Common questions

How much does a timber deck build cost in Northern Territory?
For 20 m² on a typical site, the Price Card puts it at $8,070–$17,130 ex GST, most likely around $11,760. Change the size, crew, access and condition to see your own range.
What is included in the range?
Treated pine sub-frame on concrete footings; Hardwood or merbau decking boards; Stainless or galvanised fixings; One coat of decking oil. Materials include 10% waste, labour is priced by hours for the size and crew, plus site costs and a contingency band.
How much of a timber deck build price is labour?
Trades are mostly time. On this job labour is about 42% of the likely price (49.9 hours). A charge-out rate is not a wage: the award minimum for a qualified tradesperson is $29.45/hr from 1 July 2026, and super, leave, insurance, vehicle, tools, unbillable time and margin take it to roughly $74–$133/hr (our estimate).
What is not included?
Council / certifier fees; Balustrades and stairs over 1 m; Roofing or pergola; Engineering for elevated decks. Always confirm with a written quote.
Is this a quote?
No. It is an indicative planning range built from network benchmarks. We show how many real job outcomes have been reported for each job and state. Prices vary by site, supplier and season.

Sources

See every priced job and how a fair charge-out rate is built